MISI Score
5.9
Stable
Project NC / Craven County
WW · Craven CountyDistressed
MISI Score
5.9
Stable
Score Confidence
0.7%
Peer Percentile
8.8th
As of
Jul 14, 2026
EXPLANATION
MARKET INTERPRETATION
Bridgeton operates a community water system tracked in the Munimetric coverage set. At the latest reading, the system shows limited signs of structural stress.
The score is being driven mainly by Operational Stress, with Capex Pressure contributing at a lower level. The pressure is distributed rather than concentrated in a single dimension.
2 active stress signals are attached to this system, including one at high severity. The high-severity signal in particular bears watching alongside the headline score.
Within its peer cohort, this system ranks around the 9th percentile on measured stress, placing it among the least stressed in its peer group.
Recent score history has been relatively steady, consistent with the system's overall profile.
This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.
SCORE STACK
SL 2020-79
| 2024 | 2023 | 2022 | 2021 | 2019 |
|---|---|---|---|---|
| 11 | 4 | 3 | 9 | 5 |
ACTIVE SIGNALS
Active drought conditions stress source-water availability and treatment operations.
Score impact: 3.0 · Family: Operational Stress
Elevated drought and flood exposure raises outage, source-water, and infrastructure reliability stress.
Score impact: 3.0 · Family: Operational Stress
HISTORY
Latest
5.9
Trend
+5.9
Observations
73
Days Cash on Hand
0
Days Cash As Of
Jun 30, 2023