MISI Score
24.0
Watch
Project NC / Davie County
BOTH · Davie CountyPWSID NC0230015
MISI Score
24.0
Watch
Score Confidence
0.9%
Peer Percentile
29.4th
As of
Apr 23, 2026
EXPLANATION
MARKET INTERPRETATION
As a community water provider for roughly 31,543 residents, Davie County falls into the smaller tier of scored systems. At the latest reading, Munimetric flags the system as showing early but meaningful signs of structural stress.
The score is being driven mainly by Operational Stress, which is running high in the model, with Capex Pressure adding further pressure. In other words, Operational Stress is doing most of the heavy lifting in the headline score.
3 active stress signals are attached to this system, including 3 at high severity. Multiple high-severity signals suggest the score is not being lifted by background noise alone.
Within its peer cohort, this system ranks around the 29th percentile on measured stress, placing it below typical peer-group stress levels.
Recent score history has been relatively steady, consistent with the system's overall profile.
This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.
SCORE STACK
SL 2020-79
| 2024 | 2023 | 2022 | 2021 | 2019 |
|---|---|---|---|---|
| 1 | 1 | 5 | 5 | 5 |
ACTIVE SIGNALS
Repeated or serious compliance failures often indicate rising operational and infrastructure stress.
Score impact: 12.0 · Family: Operational Stress
Active drought conditions stress source-water availability and treatment operations.
Score impact: 4.0 · Family: Operational Stress
Lead and copper exceedances and replacement obligations can drive near-term treatment and capital pressure.
Score impact: 8.0 · Family: Capex Pressure
HISTORY
Latest
24.0
Trend
+8.0
Observations
21
Population Served
31,543