MISI Score
18.0
Stable
Project NC / Craven County
BOTH · Craven CountyDistressedPWSID NC0425025
MISI Score
18.0
Stable
Score Confidence
0.8%
Peer Percentile
22.5th
As of
Apr 23, 2026
EXPLANATION
MARKET INTERPRETATION
Dover is a smaller community water system, serving approximately 425 residents. At the latest reading, the system shows limited signs of structural stress.
The score is being driven mainly by Operational Stress, which is at the top of its range in the model, with Capex Pressure contributing at a lower level. In other words, Operational Stress is doing most of the heavy lifting in the headline score.
3 active stress signals are attached to this system, including 2 at high severity. Multiple high-severity signals suggest the score is not being lifted by background noise alone.
Within its peer cohort, this system ranks around the 23rd percentile on measured stress, placing it below typical peer-group stress levels.
Recent score history has been relatively steady, consistent with the system's overall profile.
This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.
SCORE STACK
SL 2020-79
| 2024 | 2023 | 2022 | 2021 | 2019 |
|---|---|---|---|---|
| 2 | 1 | 6 | 7 | 9 |
ACTIVE SIGNALS
Repeated or serious compliance failures often indicate rising operational and infrastructure stress.
Score impact: 6.0 · Family: Operational Stress
Elevated drought and flood exposure raises outage, source-water, and infrastructure reliability stress.
Score impact: 8.0 · Family: Operational Stress
Active drought conditions stress source-water availability and treatment operations.
Score impact: 4.0 · Family: Operational Stress
HISTORY
Latest
18.0
Trend
+18.0
Observations
20
Days Cash on Hand
61
Days Cash As Of
Jun 30, 2022
Population Served
425