Project NC / Craven County

Havelock

BOTH · Craven CountyPWSID NC0425015

MISI Score

7.9

Stable

Score Confidence

0.9%

Peer Percentile

4.6th

As of

Jun 2, 2026

EXPLANATION

Score Drivers

  • MISI score is 7.914 (Stable).
  • Climate Hazard Exposure adds 3.957 points. Operational climate hazard exposure contributes +8: FEMA NRI composite score is 93.5800. variance weighting adjusted headline contribution from 8 to 7.198. concentration guardrail adjusted headline contribution from 7.198 to 3.957.
  • Current Drought Severity adds 3.957 points. Current drought severity contributes +4: USDM severity index is 0.5000 as of 2026-05-26. variance weighting adjusted headline contribution from 4 to 3.957.
  • Missing or unresolved factors: Infrastructure Capital Gap, Project Status Staleness.

MARKET INTERPRETATION

What the data suggests

As a community water provider for roughly 14,925 residents, Havelock falls into the smaller tier of scored systems. At the latest reading, the system shows limited signs of structural stress.

The score is being driven mainly by Operational Stress, with Capex Pressure contributing at a lower level. The pressure is distributed rather than concentrated in a single dimension.

2 active stress signals are attached to this system, including 2 at high severity. Multiple high-severity signals suggest the score is not being lifted by background noise alone.

Within its peer cohort, this system ranks around the 5th percentile on measured stress, placing it among the least stressed in its peer group.

Recent score history has been relatively steady, consistent with the system's overall profile.

This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.

SCORE STACK

Family Contributions

Operational Stress7.9 / 20.0
Capex Pressure0.0 / 20.0
Revenue Fragility0.0 / 20.0
Rate Constraint0.0 / 20.0
Governance Risk0.0 / 20.0

SL 2020-79

SWIA Assessment History

20242023202220212019
96222

ACTIVE SIGNALS

2 Signals

SignificantactiveApr 7, 2026

Climate Hazard Exposure

Elevated drought and flood exposure raises outage, source-water, and infrastructure reliability stress.

Score impact: 4.0 · Family: Operational Stress

SignificantactiveApr 7, 2026

Current Drought Severity

Active drought conditions stress source-water availability and treatment operations.

Score impact: 4.0 · Family: Operational Stress

HISTORY

Score Trend

Latest

7.9

Trend

+7.9

Observations

50

Mar 24, 2026 · 0.0Mar 25, 2026 · 0.0Mar 27, 2026 · 0.0Mar 29, 2026 · 0.0Apr 2, 2026 · 6.0Apr 3, 2026 · 6.0Apr 3, 2026 · 6.0Apr 4, 2026 · 0.0Apr 5, 2026 · 0.0Apr 5, 2026 · 0.0Apr 6, 2026 · 12.0Apr 7, 2026 · 12.0Apr 8, 2026 · 12.0Apr 9, 2026 · 12.0Apr 10, 2026 · 12.0Apr 13, 2026 · 12.0Apr 14, 2026 · 12.0Apr 18, 2026 · 12.0Apr 19, 2026 · 12.0Apr 21, 2026 · 12.0Apr 22, 2026 · 12.0Apr 23, 2026 · 12.0Apr 24, 2026 · 12.0Apr 25, 2026 · 12.0Apr 26, 2026 · 12.0Apr 26, 2026 · 7.9Apr 27, 2026 · 7.9Apr 28, 2026 · 7.9Apr 29, 2026 · 7.9Apr 30, 2026 · 7.9May 1, 2026 · 7.9May 2, 2026 · 7.9May 3, 2026 · 7.9May 4, 2026 · 7.9May 5, 2026 · 7.9May 6, 2026 · 7.9May 7, 2026 · 7.9May 8, 2026 · 7.9May 9, 2026 · 7.9May 10, 2026 · 7.9May 17, 2026 · 7.9May 19, 2026 · 7.9May 21, 2026 · 7.9May 22, 2026 · 7.9May 24, 2026 · 7.9May 26, 2026 · 7.9May 28, 2026 · 7.9May 31, 2026 · 7.9Jun 1, 2026 · 7.9Jun 2, 2026 · 7.9Mar 24, 2026Jun 2, 2026

NC TREASURER FBA

Financial Benchmarks

Population17,479
General Fund Expenditure$14.9M
Fund Balance Available$17.5M
Fund Balance %117.7%
Cash & Investments$33.2M
Assessed Valuation$1144.0M
Tax Rate0.7
Effective Tax Rate0.7
Tax Collection %99.5%
Amount Uncollected$43K

Days Cash on Hand

406

Days Cash As Of

Jun 30, 2024

Population Served

14,925