MISI Score
15.1
Stable
Project NC / Martin County
DW · Martin CountyDistressedPWSID NC6059015
MISI Score
15.1
Stable
Score Confidence
0.8%
Peer Percentile
21.6th
As of
Jun 2, 2026
EXPLANATION
MARKET INTERPRETATION
Martin County operates a community water system tracked in the Munimetric coverage set. At the latest reading, the system shows limited signs of structural stress.
The score is being driven mainly by Operational Stress, which is running high in the model, with Capex Pressure contributing at a lower level. In other words, Operational Stress is doing most of the heavy lifting in the headline score.
3 active stress signals are attached to this system, including 2 at high severity. Multiple high-severity signals suggest the score is not being lifted by background noise alone.
Within its peer cohort, this system ranks around the 22nd percentile on measured stress, placing it below typical peer-group stress levels.
Recent score history has been relatively steady, consistent with the system's overall profile.
This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.
SCORE STACK
SL 2020-79
| 2024 | 2023 | 2022 | 2021 | 2019 |
|---|---|---|---|---|
| 12 | 11 | 12 | 11 | 8 |
ACTIVE SIGNALS
Repeated or serious compliance failures often indicate rising operational and infrastructure stress.
Score impact: 7.5 · Family: Operational Stress
Recurring monitoring or reporting failures often signal weak administrative capacity or deteriorating operational discipline.
Score impact: 3.6 · Family: Operational Stress
Active drought conditions stress source-water availability and treatment operations.
Score impact: 4.0 · Family: Operational Stress
HISTORY
Latest
15.1
Trend
-2.9
Observations
48