Project NC / McDowell County

Old Fort

BOTH · McDowell CountyPWSID NC0156025

MISI Score

43.3

Fragile

Score Confidence

1.0%

Peer Percentile

97.7th

As of

Sep 10, 2026

EXPLANATION

Score Drivers

  • MISI score is 43.342 (Fragile).
  • Infrastructure Capital Gap adds 11.238 points. Capex pressure contributes +12: drinking-water capital need is 4617567.706299 with per-capita burden 2716.22. variance weighting adjusted headline contribution from 12 to 11.238.
  • Compliance Escalation adds 9.882 points. Operational compliance contributes +10: 11 violations or enforcement actions have been recorded within the last three years. variance weighting adjusted headline contribution from 10.000000 to 9.882.
  • PFAS Contamination Risk adds 7.998 points. PFAS contamination contributes +8: detections=5, max result=11.000000 ng/L. variance weighting adjusted headline contribution from 8 to 7.998.
  • Population Served Decline adds 5.464 points. Population trend contributes +6: five-year population change is -5.273754%. variance weighting adjusted headline contribution from 6 to 5.464.
  • Missing or unresolved factors: Project Status Staleness.

MARKET INTERPRETATION

What the data suggests

Old Fort is a smaller community water system, serving approximately 1,700 residents. The current reading places the system in a zone of moderate-to-elevated stress that goes beyond normal operating variation.

The score is being driven mainly by Capex Pressure, which is at the top of its range in the model, with Operational Stress adding another heavy layer of pressure. That combination suggests strain is showing up across core system functions, not just one isolated dimension.

8 active stress signals are attached to this system, including 3 at high severity. That signal mix points to a system where several warning indicators are firing at once, not just one extreme outlier.

Within its peer cohort, this system ranks around the 98th percentile on measured stress, placing it near the top of peer-group stress.

Recent observations suggest the system has been relatively steady rather than sharply improving or deteriorating — the current picture looks more like persistent underlying pressure than a sudden shift.

This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.

SCORE STACK

Family Contributions

Operational Stress15.5 / 20.0
Capex Pressure20.0 / 20.0
Revenue Fragility5.5 / 20.0
Rate Constraint0.0 / 20.0
Governance Risk2.4 / 20.0

SL 2020-79

SWIA Assessment History

20242023202220212019
33346

ACTIVE SIGNALS

8 Signals

SignificantactiveApr 2, 2026

Infrastructure Capital Gap

Large structural capital need relative to local support capacity often precedes major rate or funding pressure.

Score impact: 11.2 · Family: Capex Pressure

SignificantactiveApr 3, 2026

Compliance Escalation

Repeated or serious compliance failures often indicate rising operational and infrastructure stress.

Score impact: 9.9 · Family: Operational Stress

MaterialactiveApr 7, 2026

Climate Hazard Exposure

Elevated drought and flood exposure raises outage, source-water, and infrastructure reliability stress.

Score impact: 3.6 · Family: Operational Stress

MaterialactiveApr 7, 2026

Lead & Copper Rule Risk

Lead and copper exceedances and replacement obligations can drive near-term treatment and capital pressure.

Score impact: 5.0 · Family: Capex Pressure

MaterialactiveApr 3, 2026

Population Served Decline

A shrinking served population weakens the customer base and raises infrastructure cost per customer.

Score impact: 5.5 · Family: Revenue Fragility

MaterialactiveApr 3, 2026

Rapid Score Deterioration

Abrupt deterioration can indicate multiple compounding issues crossing thresholds together.

Score impact: 2.4 · Family: Governance Risk

MaterialactiveApr 7, 2026

Current Drought Severity

Active drought conditions stress source-water availability and treatment operations.

Score impact: 2.0 · Family: Operational Stress

SignificantactiveApr 7, 2026

PFAS Contamination Risk

PFAS detections can force expensive treatment retrofits and accelerate capital plans.

Score impact: 8.0 · Family: Capex Pressure

HISTORY

Score Trend

Latest

43.3

Trend

+43.3

Observations

111

Apr 1, 2026 · 0.0Apr 2, 2026 · 12.0Apr 2, 2026 · 0.0Apr 3, 2026 · 27.0Apr 3, 2026 · 18.0Apr 4, 2026 · 27.0Apr 5, 2026 · 27.0Apr 5, 2026 · 27.0Apr 6, 2026 · 43.0Apr 7, 2026 · 43.0Apr 8, 2026 · 43.0Apr 9, 2026 · 43.0Apr 10, 2026 · 43.0Apr 13, 2026 · 43.0Apr 14, 2026 · 43.0Apr 18, 2026 · 43.0Apr 19, 2026 · 43.0Apr 21, 2026 · 43.0Apr 22, 2026 · 43.0Apr 23, 2026 · 43.0Apr 24, 2026 · 43.0Apr 25, 2026 · 43.0Apr 26, 2026 · 43.0Apr 26, 2026 · 41.4Apr 27, 2026 · 41.4Apr 28, 2026 · 41.4Apr 29, 2026 · 41.4Apr 30, 2026 · 41.4May 1, 2026 · 41.4May 2, 2026 · 41.4May 3, 2026 · 41.4May 4, 2026 · 41.4May 5, 2026 · 41.4May 6, 2026 · 41.4May 7, 2026 · 41.4May 8, 2026 · 41.4May 9, 2026 · 41.4May 10, 2026 · 41.4May 17, 2026 · 41.4May 19, 2026 · 41.4May 21, 2026 · 41.4May 22, 2026 · 41.4May 24, 2026 · 41.4May 26, 2026 · 41.4May 28, 2026 · 41.4May 31, 2026 · 41.4Jun 1, 2026 · 41.4Jun 2, 2026 · 41.4Jun 8, 2026 · 41.4Jun 11, 2026 · 41.4Jun 12, 2026 · 41.4Jun 14, 2026 · 41.4Jun 15, 2026 · 41.4Jun 16, 2026 · 41.4Jun 22, 2026 · 41.4Jun 23, 2026 · 41.4Jun 28, 2026 · 41.4Jun 29, 2026 · 41.4Jun 30, 2026 · 41.4Jul 1, 2026 · 41.4Jul 2, 2026 · 41.4Jul 3, 2026 · 41.4Jul 4, 2026 · 41.4Jul 5, 2026 · 41.4Jul 6, 2026 · 41.4Jul 7, 2026 · 41.4Jul 8, 2026 · 41.4Jul 9, 2026 · 41.4Jul 10, 2026 · 41.4Jul 11, 2026 · 41.4Jul 12, 2026 · 41.4Jul 13, 2026 · 41.4Jul 14, 2026 · 41.4Jul 16, 2026 · 41.4Jul 17, 2026 · 41.4Jul 18, 2026 · 41.4Jul 19, 2026 · 41.4Jul 20, 2026 · 41.4Jul 21, 2026 · 41.4Jul 22, 2026 · 41.4Jul 23, 2026 · 41.4Jul 29, 2026 · 40.4Jul 30, 2026 · 40.4Jul 31, 2026 · 39.4Aug 1, 2026 · 43.3Aug 2, 2026 · 43.3Aug 3, 2026 · 43.3Aug 8, 2026 · 43.3Aug 9, 2026 · 43.3Aug 10, 2026 · 43.3Aug 15, 2026 · 43.3Aug 16, 2026 · 43.3Aug 17, 2026 · 43.3Aug 18, 2026 · 43.3Aug 20, 2026 · 43.3Aug 22, 2026 · 43.3Aug 23, 2026 · 43.3Aug 24, 2026 · 43.3Aug 25, 2026 · 43.3Aug 26, 2026 · 43.3Aug 27, 2026 · 43.3Aug 28, 2026 · 43.3Aug 31, 2026 · 43.3Sep 1, 2026 · 43.3Sep 2, 2026 · 43.3Sep 4, 2026 · 43.3Sep 5, 2026 · 43.3Sep 6, 2026 · 43.3Sep 7, 2026 · 43.3Sep 9, 2026 · 43.3Sep 10, 2026 · 43.3Apr 1, 2026Sep 10, 2026

NC TREASURER FBA

Financial Benchmarks

Population809
General Fund Expenditure$1.3M
Fund Balance Available$2.2M
Fund Balance %176.4%
Cash & Investments$3.3M
Assessed Valuation$171.6M
Tax Rate0.4
Effective Tax Rate0.4
Tax Collection %97.2%
Amount Uncollected$18K

Days Cash on Hand

441

Days Cash As Of

Jun 30, 2024

Population Served

1,700

Old Fort — Project NC | Munimetric