MISI Score
33.0
Watch
Project NC / Nash/Edgecombe County
BOTH · Nash/Edgecombe CountyPWSID NC0464010
MISI Score
33.0
Watch
Score Confidence
1.0%
Peer Percentile
65.9th
As of
Apr 23, 2026
EXPLANATION
MARKET INTERPRETATION
Rocky Mount's drinking-water system serves about 55,891 residents, making it a mid-size system within the coverage universe. At the latest reading, Munimetric flags the system as showing early but meaningful signs of structural stress.
The score is being driven mainly by Capex Pressure, which is at the top of its range in the model, with Operational Stress adding further pressure. In other words, Capex Pressure is doing most of the heavy lifting in the headline score.
7 active stress signals are attached to this system, including one at high severity. The breadth of active signals, even without concentrated high severity, suggests pressure across more than one dimension.
Within its peer cohort, this system ranks around the 66th percentile on measured stress, placing it above most of its peers on measured stress, though not yet in the most extreme tier.
Recent score history has been relatively steady, consistent with the system's overall profile.
This summary is based on structured, source-backed public data and is intended for research and monitoring only. It is not investment advice, a credit opinion, or municipal advisory guidance.
SCORE STACK
SL 2020-79
| 2024 | 2023 | 2022 | 2021 | 2019 |
|---|---|---|---|---|
| 6 | 6 | 6 | 3 | 2 |
ACTIVE SIGNALS
PFAS detections can force expensive treatment retrofits and accelerate capital plans.
Score impact: 6.0 · Family: Capex Pressure
Large structural capital need relative to local support capacity often precedes major rate or funding pressure.
Score impact: 8.0 · Family: Capex Pressure
Weak unrestricted liquidity reduces the utility's ability to absorb rate, capex, or operating shocks.
Score impact: 2.0 · Family: Revenue Fragility
Parent-government debt, pension, or operating stress can constrain infrastructure support and governance flexibility.
Score impact: 2.0 · Family: Governance Risk
Elevated drought and flood exposure raises outage, source-water, and infrastructure reliability stress.
Score impact: 6.0 · Family: Operational Stress
Active drought conditions stress source-water availability and treatment operations.
Score impact: 4.0 · Family: Operational Stress
HISTORY
Latest
33.0
Trend
+33.0
Observations
30
NC TREASURER FBA
Days Cash on Hand
108
Days Cash As Of
Jun 30, 2024
Population Served
55,891
Lead and copper exceedances and replacement obligations can drive near-term treatment and capital pressure.
Score impact: 5.0 · Family: Capex Pressure